According to the existing equipment status on Jiafeng station of Houma-Yueshan line and its connected Sihe loading point,as well as the added loading capacity required for the Sihe loading point,the essay puts forward the reconstruction plan of Sihe loading point and Jiafeng station,and makes qualitative and quantitative analysis on their benefits with and without reconstruction.
依据侯月线嘉峰站及与其接轨的寺河装车点的既有设备概况和寺河装车点需要增加的装车能力,提出了寺河装车点与嘉峰站的改造方案,并对改造前后的效益作了定性、定量的分析。
The approach and principles for the design of liquefied gas loading facility are explainedand analyzed from the viewpoint of process consideration, with the emphases on the loading control scheme, the selection of major equipment and the deployment of safety devices.
从工艺设计的角度分析和阐述了液化气装车设施的设计思路和设计原则,重点介绍了装车控制方案、主要设备选型、安全措施的设置等。